“When will it be ready?” It’s the question everyone asks us, and the honest answer is: 4 weeks from draft approval. Maybe you have a trade show in March, a store opening in the spring or an old website that embarrasses you every time you mention it to a customer. When you wonder how long it takes to build a website, you need a date, not an “it depends”.
Those 4 weeks are the actual development, which is the most predictable part of the work, and with us they’re written into the contract. What stretches the timeline almost always happens before and around those weeks: copy and photos that don’t arrive, approvals that stall, connections with other software, migrations from the old website. In this guide we explain how the weeks break down, what really makes them slip and how to shorten them without sacrificing quality.
How long it takes, phase by phase
A website isn’t born the day you sign. The build time splits into two parts: preparation that depends a lot on you and work that depends on us. In the projects we handle, they line up like this:
- Consultation and quote: after the first call, you receive a detailed, itemized quote within 48 hours.
- First draft: we prepare it before you sign and it’s free, so you see the direction before you commit.
- Feedback and approval: here you set the pace. A few days may be enough, or it may take weeks.
- Development and launch: from draft approval, the website is live within 4 weeks.
This isn’t a verbal estimate: for every week of delay caused by us, you get a 5% discount, and it’s in black and white. You’ll find the phases of our method and the five commitments of the guarantee on the page about website development.
For other projects the timelines change. An online store usually takes 2 to 8 weeks, depending on the catalog, payments and shipping: it’s explained on the page about e-commerce development. Custom business software, on the other hand, takes 3 to 12 months, depending on complexity. If you’re still defining your budget, the price ranges for each type of website are in the guide on how much a website costs in 2026.
Practical tip: when you compare quotes, ask when the promised weeks start counting and what happens if the delay is the agency’s fault. A date without a precise starting point, and without consequences for whoever misses it, isn’t worth much.
Content and materials: the most common delay
In over 200 projects since 2019 we’ve learned one thing: the most frequent delay is almost never the code. It’s the materials. Photos of your work, the logo in a usable format, information about your services, access to the domain. What we often see is the contract signed and only afterwards the hunt for content: that way 3-4 weeks are lost before work even begins.
Imagine a construction company that wants to show its finished projects. The website is ready, but the photos are on a business partner’s phone, and he sends them a few at a time between one site visit and the next. Three weeks go by and the website just sits there: ready, but invisible.
We write or review the copy ourselves, so you never start from a blank page. Some information, though, only you have: what you do better than your competitors, who your typical customers are, which projects you want to show. Google itself, in its guide on creating helpful content, asks whether a piece of content demonstrates first-hand experience. That’s exactly what can only come from you.
Practical tip: prepare a shared folder before you sign, with your logo in vector format, high-resolution photos, the list of your services and access to your current domain. It’s the simplest way to gain weeks.
Approvals and feedback: the weeks you don’t see
The second brake is subtler, because it doesn’t appear in any quote: the time that passes between one of our proposals and your response. Every round of revisions needs your yes, and every late yes pushes everything else back.
A typical case: three business partners, three opinions. The draft arrives on Monday. The first replies right away, the second after a week, the third asks to change the colors when the other two had already approved. Nobody did anything wrong, but in the meantime a month has gone by.
That’s why, with us, the 4 weeks start from draft approval: it’s the only way to give you a date we can truly guarantee. The time before that depends on how quickly content and feedback arrive.
Practical tip: choose a single person who collects everyone’s feedback and sends it in one list. And set a date for each response, as you would with any other supplier.
Integrations: when the website needs to talk to other software
A brochure website lives on its own. Many projects, though, need to connect to something else: the warehouse management software, the CRM, the invoicing program, a booking system, the couriers. Each connection is a small project within the project, with timelines that don’t depend only on whoever is building the website.
The reason is simple. To make two pieces of software talk to each other you need technical documentation, access credentials and sometimes the help of whoever supplied the other program. If that supplier replies after ten days, the job waits ten days. In our custom software projects, the technical analysis of the integrations alone adds 20-30% to development time, and it’s time well spent: discovering a limitation halfway through costs much more.
Practical tip: from the very first call, list all the programs the website will need to touch. Then ask their suppliers right away whether they offer a connection (the so-called APIs) and who to contact to activate it.
Migrating from the old website: what not to leave until the last minute
If you already have a website, rebuilding it doesn’t just mean building the new one. You need to bring along what works: the pages Google knows, the email addresses tied to the domain, the product pages, sometimes years of orders and customers. And you need the logins to do it.
Logins are the first snag. A common mistake we notice is a domain registered in the name of the old provider, who maybe no longer even answers the phone. For .it domains, you can check in a few seconds who the domain is registered to with the public lookup of the Registro .it (the registry for Italian .it domains): if the name isn’t yours, start the recovery before the project begins, not on launch day.
Then there’s Google. When page addresses change, you need redirects (301 redirects), which tell Google where each piece of content has moved. Google itself, in its guide to site moves and migrations, warns that for a medium-sized site it can take a few weeks for the new addresses to replace the old ones, and recommends keeping the redirects for at least a year.
With a planned migration, you can change everything without stopping. For Wine Republic, an online shop for organic wines, we rebuilt the catalog, checkout and product page SEO from scratch without stopping sales: in the first 3 months, conversions grew by 45%. You’ll find the details in the Wine Republic case study.
Practical tip: before starting, recover the logins for your domain, hosting and email, and ask for the list of the old website’s pages with their destination on the new one. If nobody brings it up, ask for it yourself.
In short
- At LAVDER, a website goes live within 4 weeks of draft approval, with the date written into the contract and a 5% discount for every week of delay caused by us.
- An e-commerce store usually takes 2 to 8 weeks, custom business software 3 to 12 months, depending on complexity.
- The most common delay is materials: photos, logo, information about your services and domain access, to be prepared before you sign.
- Slow approvals push everything back: a single point of contact and a date for each response shorten the timeline.
- Integrations and migrations need to be planned from the start: logins, connections with other software and redirects can’t be improvised on launch day.
Frequently asked questions
How long does it take to build a website?
With us, a website goes live within 4 weeks of draft approval, with the date written into the contract. Before that come the quote, which arrives within 48 hours, and the free first draft. The total time depends mainly on how quickly content and feedback arrive from you.
Can you build a website in a week?
With a ready-made template and all the content in hand, a simple website can be put together quickly, but it ends up looking like many others. A website that brings in customers requires analysis, copy and testing on real phones and computers. If someone promises you a complete business website in a week, some of these phases are missing.
What should I prepare to shorten the timeline?
Your logo in vector format, high-resolution photos of your work or products, the list of your services with the information only you know, and access to your current domain. It also helps a lot to name a single person who collects feedback and approves the drafts, with a precise date for each response.
How long does an e-commerce store take?
With us, usually 2 to 8 weeks, depending on the catalog, payment methods, shipping and connections with your business software. If you already sell online, you also need to migrate products and customers and set up redirects so you don’t lose your rankings: the old store stays active until the new one has been fully tested.
Will rebuilding my website make me lose my Google rankings?
Not permanently, if the migration is done right. Every old address must point to the corresponding new page with a 301 redirect. Google warns that for a medium-sized site it can take a few weeks for the new addresses to replace the old ones, and recommends keeping the redirects for at least a year.
Already have a date in mind for your new website?
In a free 30-minute consultation, we look at what you need and what you already have ready, and tell you honestly when your website can go live.
Book a free consultation